Multifamily Painting in the Seattle Area

Unit, corridor and common area painting for apartment, condo and townhome builders.

Modern mid-rise apartment building with mixed panel and wood-look siding and balconies

What multifamily painting includes

Multifamily painting covers units, corridors, stair towers, amenity rooms, lobbies, garages and exteriors, all in one scope when the spec lists them. We bid from the plans and unit matrix and plan our phases with your super.

Multifamily work is about repeating the same finish across many units, floor after floor, while other trades move through the building. We set the color and sheen schedule by area before we start and follow drywall up the building.

What We Cover

Surfaces and scope we handle

  • Units

    Walls, ceilings, trim and doors by unit type.

  • Corridors and lobbies

    Durable finishes that stand up to move-in traffic.

  • Stair towers

    Walls, rails and doors.

  • Amenity spaces

    Fitness rooms, lounges, leasing offices and roof decks.

  • Doors and frames

    Unit doors, hollow metal frames and service doors.

  • Parking and podium levels

    Concrete walls, columns and ceilings when specified.

  • Exterior

    Siding, trim, balcony and railing finishes.

  • Punch list

    Unit-by-unit walk and close out before turnover.

Our Multifamily Process

How the job runs

1

Bid review

We take off units by type, plus corridors, stairs and common areas, and list what is in and out.

2

Floor plan with your super

We agree on which floors or units we start, and how we follow drywall up the building.

3

Prep and protect

Each area is masked and covered before we spray, including windows, tubs and finished floors.

4

Prime and first coats

We prime new drywall and put first coats on as each floor is released.

5

Finish and touch-up

Final coats and touch-ups go on after cabinets, counters, trim and flooring.

6

Unit punch walks

We walk units with your team and close our items so units can turn over.

7

Common areas last

Lobbies and corridors get final touch-up near the end, after move-in traffic from the trades is done.

What sets us apart

Our full crew on one project

On big multifamily projects, we work with our local crew. We can have our entire crew on a single project in order to have them move even faster.

One color and sheen schedule

We set up the colors by area before we start so every floor matches. The same products go in every unit, checked against the first finished unit.

Fire-rated door labels stay readable

We mask fire-rated door labels and keep paint off them, as fire door rules require.

Coatings made for concrete

Podium and parking levels get coatings made for masonry, applied only after the concrete has cured as long as the product requires.

Phased turnover

We punch units in groups that match your turnover phases, so units can release on schedule.

Exterior planned for dry weather

Siding, balcony and railing coats are planned for dry stretches and timed around the siding maker's rules.

What we suggest

If you are bidding a multifamily building, here is what we suggest. Send the unit matrix and the floor release order with the plans, so we can build the calendar into the bid.

Set the color and sheen schedule by unit type, corridor and amenity area before the first floor is finished, so later floors match the first.

Plan podium and parking coatings on their own part of the calendar, separate from the drywall units, since concrete cure time drives that schedule.

Finishes for Multifamily

Finishes that fit how the building is used

Units often use flat or eggshell walls and semi-gloss or satin trim and doors. Corridors and stairs see carts, furniture and daily traffic, so specs often call for a more washable finish there. We follow the finish schedule and the paint maker's data sheets.

Fire-rated doors and frames have labels that must stay readable. We mask them and keep paint off them. Hollow metal frames get a primer and finish that is made for metal.

Color schedules can get complex on a large building, with different colors for units, accents and common areas. We set up the colors by area before we start so every floor matches.

What Shapes the Bid

What shapes a multifamily bid

We do not publish prices because every building is different. These items move the number:

  • ·Unit count and unit types
  • ·Corridor, stair and amenity square footage
  • ·Number of colors, sheens and accent walls
  • ·Drywall finish level and lighting in corridors
  • ·Doors and frames, and whether they come prefinished
  • ·Podium, garage and exterior scope
  • ·How the building is phased and released to us

Send the plans and unit matrix and we will price it.

Weather and Timing

Weather, cure time and big buildings

A multifamily building can take many months to paint, so most jobs cross at least one rainy season. Exterior siding and balcony coats need dry surfaces and temperatures above the label minimum, so we plan those faces for drier stretches and watch the forecast. Inside, cold or damp floors slow drying and can leave flashing on walls. Before we finish a floor, we ask whether heat and airflow are running, because they affect how the final coat looks.

Photos

The work we do

Four story apartment building under construction, wrapped in scaffolding with new windows installed
Painter in protective clothing and a respirator spraying a white deck railing from a ladder
New construction kitchen with the island and cabinets masked for painting

What GCs can expect

This is how your new construction painting subcontractor runs every job, from bid to closeout.

We bid from your documents

Send plans, a finish schedule or a written scope. We price what is drawn and spell out inclusions and exclusions, so bids are easy to compare.

We ask before we price

If a sheen, color or finish level is not called out, we ask during the bid, not after we start.

We work with your super

We plan our phases around drywall, cabinets, flooring and trim, and we keep in touch when the schedule shifts.

We prep before we paint

Masking, floor protection and surface prep come first on every phase.

We walk it with you

We do a walkthrough with your team, then work the punch list until it is closed.

We leave it clean

Our materials leave with us and the area is tidy for the next trade.

Where we offer multifamily

We offer multifamily for builders and general contractors across the Seattle area from our base in Everett, WA.

FAQ

Multifamily painting FAQ

What size buildings do you bid?+

Send us the plans and we will tell you if it fits. We bid townhome rows, apartments, condos and mixed use buildings with units over retail.

Can you start before the whole building is drywalled?+

Yes. We usually start priming as floors or units are released and follow the drywall crew up the building.

How do you keep units consistent?+

We work from one color and sheen schedule, use the same products in every unit and check each unit type against the first one we finish.

Do you paint garages and podium levels?+

When they are in the spec. Concrete walls, columns and ceilings need coatings made for masonry, so tell us what the spec calls for.

How do you handle fire-rated door labels?+

We mask them so they stay readable, as fire door rules require.

Do you do unit punch walks?+

Yes. We walk units with your team and close our paint items so units can turn over.

Can you paint balconies and railings?+

Yes, when they are in the paint scope. Metal railings need the right primer for metal, and we plan that work for dry weather.

Where do you work?+

We are based in Everett and work across the Seattle area, north to Marysville and south to Renton.

Bidding an apartment or condo job?

Send the plans, unit matrix and bid date.