Multifamily Painting in the Seattle Area
Unit, corridor and common area painting for apartment, condo and townhome builders.
What multifamily painting includes
Multifamily painting covers units, corridors, stair towers, amenity rooms, lobbies, garages and exteriors, all in one scope when the spec lists them. We bid from the plans and unit matrix and plan our phases with your super.
Multifamily work is about repeating the same finish across many units, floor after floor, while other trades move through the building. We set the color and sheen schedule by area before we start and follow drywall up the building.
What We Cover
Surfaces and scope we handle
Units
Walls, ceilings, trim and doors by unit type.
Corridors and lobbies
Durable finishes that stand up to move-in traffic.
Stair towers
Walls, rails and doors.
Amenity spaces
Fitness rooms, lounges, leasing offices and roof decks.
Doors and frames
Unit doors, hollow metal frames and service doors.
Parking and podium levels
Concrete walls, columns and ceilings when specified.
Exterior
Siding, trim, balcony and railing finishes.
Punch list
Unit-by-unit walk and close out before turnover.
Our Multifamily Process
How the job runs
Bid review
We take off units by type, plus corridors, stairs and common areas, and list what is in and out.
Floor plan with your super
We agree on which floors or units we start, and how we follow drywall up the building.
Prep and protect
Each area is masked and covered before we spray, including windows, tubs and finished floors.
Prime and first coats
We prime new drywall and put first coats on as each floor is released.
Finish and touch-up
Final coats and touch-ups go on after cabinets, counters, trim and flooring.
Unit punch walks
We walk units with your team and close our items so units can turn over.
Common areas last
Lobbies and corridors get final touch-up near the end, after move-in traffic from the trades is done.
What sets us apart
Our full crew on one project
On big multifamily projects, we work with our local crew. We can have our entire crew on a single project in order to have them move even faster.
One color and sheen schedule
We set up the colors by area before we start so every floor matches. The same products go in every unit, checked against the first finished unit.
Fire-rated door labels stay readable
We mask fire-rated door labels and keep paint off them, as fire door rules require.
Coatings made for concrete
Podium and parking levels get coatings made for masonry, applied only after the concrete has cured as long as the product requires.
Phased turnover
We punch units in groups that match your turnover phases, so units can release on schedule.
Exterior planned for dry weather
Siding, balcony and railing coats are planned for dry stretches and timed around the siding maker's rules.
What we suggest
If you are bidding a multifamily building, here is what we suggest. Send the unit matrix and the floor release order with the plans, so we can build the calendar into the bid.
Set the color and sheen schedule by unit type, corridor and amenity area before the first floor is finished, so later floors match the first.
Plan podium and parking coatings on their own part of the calendar, separate from the drywall units, since concrete cure time drives that schedule.
Finishes for Multifamily
Finishes that fit how the building is used
Units often use flat or eggshell walls and semi-gloss or satin trim and doors. Corridors and stairs see carts, furniture and daily traffic, so specs often call for a more washable finish there. We follow the finish schedule and the paint maker's data sheets.
Fire-rated doors and frames have labels that must stay readable. We mask them and keep paint off them. Hollow metal frames get a primer and finish that is made for metal.
Color schedules can get complex on a large building, with different colors for units, accents and common areas. We set up the colors by area before we start so every floor matches.
What Shapes the Bid
What shapes a multifamily bid
We do not publish prices because every building is different. These items move the number:
- ·Unit count and unit types
- ·Corridor, stair and amenity square footage
- ·Number of colors, sheens and accent walls
- ·Drywall finish level and lighting in corridors
- ·Doors and frames, and whether they come prefinished
- ·Podium, garage and exterior scope
- ·How the building is phased and released to us
Send the plans and unit matrix and we will price it.
Weather and Timing
Weather, cure time and big buildings
A multifamily building can take many months to paint, so most jobs cross at least one rainy season. Exterior siding and balcony coats need dry surfaces and temperatures above the label minimum, so we plan those faces for drier stretches and watch the forecast. Inside, cold or damp floors slow drying and can leave flashing on walls. Before we finish a floor, we ask whether heat and airflow are running, because they affect how the final coat looks.
Photos
The work we do
What GCs can expect
This is how your new construction painting subcontractor runs every job, from bid to closeout.
We bid from your documents
Send plans, a finish schedule or a written scope. We price what is drawn and spell out inclusions and exclusions, so bids are easy to compare.
We ask before we price
If a sheen, color or finish level is not called out, we ask during the bid, not after we start.
We work with your super
We plan our phases around drywall, cabinets, flooring and trim, and we keep in touch when the schedule shifts.
We prep before we paint
Masking, floor protection and surface prep come first on every phase.
We walk it with you
We do a walkthrough with your team, then work the punch list until it is closed.
We leave it clean
Our materials leave with us and the area is tidy for the next trade.
Where we offer multifamily
We offer multifamily for builders and general contractors across the Seattle area from our base in Everett, WA.
FAQ
Multifamily painting FAQ
What size buildings do you bid?+
Send us the plans and we will tell you if it fits. We bid townhome rows, apartments, condos and mixed use buildings with units over retail.
Can you start before the whole building is drywalled?+
Yes. We usually start priming as floors or units are released and follow the drywall crew up the building.
How do you keep units consistent?+
We work from one color and sheen schedule, use the same products in every unit and check each unit type against the first one we finish.
Do you paint garages and podium levels?+
When they are in the spec. Concrete walls, columns and ceilings need coatings made for masonry, so tell us what the spec calls for.
How do you handle fire-rated door labels?+
We mask them so they stay readable, as fire door rules require.
Do you do unit punch walks?+
Yes. We walk units with your team and close our paint items so units can turn over.
Can you paint balconies and railings?+
Yes, when they are in the paint scope. Metal railings need the right primer for metal, and we plan that work for dry weather.
Where do you work?+
We are based in Everett and work across the Seattle area, north to Marysville and south to Renton.
Related Services
Other paint work we do for builders
Bidding an apartment or condo job?
Send the plans, unit matrix and bid date.




