Development and Commercial Painting
Development and Commercial Painting in the Seattle Area
Paint for mixed use, office, retail and light industrial projects, bid from your specs.
At a Glance
SamDan Painting works with developers and general contractors on commercial and mixed use projects across the Seattle area. That can mean a mixed use building with retail on the ground floor, a new office or medical building, a retail pad or a light industrial shell. We bid from the drawings and the painting section of the spec, plan submittals and phases with your team and close out the punch list. We are based in Everett, WA. WA L&I Reg. # SAMDACL771ND.
What We Cover
Surfaces and scope we handle
Mixed use buildings: Retail levels, lobbies, amenity floors and residential floors.
Office and medical buildings: Core, shell and common areas.
Retail shells and pads: Interior walls, exterior finishes and back-of-house rooms.
Light industrial: Office areas, walls and doors in warehouse shells.
Concrete and masonry: Coatings for podium walls, columns and block.
Metals: Doors, frames, rails, bollards and exposed steel when specified.
Exterior envelopes: Siding, panels, trim and soffits.
Closeout: Punch list, touch-up and attic stock labeling when specified.
Our Commercial Process
How the job runs
Spec and bid review
We read the painting section of the spec, usually Division 09 91 00, plus the finish schedule and drawings.
Submittals
We prepare product data and color samples for the architect's review when the spec asks for them.
Phase plan
We set start dates by area with your super: podium, floors, core, retail and exterior.
Prep and protect
Masking, floor and glass protection and surface prep on each area before coating.
Coating by system
Each surface gets the primer and finish system the spec lists for it.
Mockups and inspections
When the spec calls for a sample area or a coating inspection, we schedule it with your team.
Punch list and closeout
We walk the building and finish our items before turnover.
Coating Systems
The right coating system for each surface
Commercial specs usually list a coating system for each surface: drywall, concrete, masonry, wood, steel and galvanized metal. Each system names the primer and the finish coats. We follow the system and the maker's data sheets, and ask if a system is missing.
Concrete and masonry need time to cure before they take paint. Fresh concrete is wet and alkaline, which can ruin a coating that goes on too soon. We check the cure time the coating maker requires before we schedule podium and block work.
Galvanized and bare steel need primers made for metal, or the finish can peel. Exterior metals and rails are a common place for coatings to fail in our climate, so we prep them carefully and keep them out of wet weather while they cure.
What Shapes the Bid
What shapes a commercial bid
We do not publish prices because every project and spec is different. These items move the number:
- ·Building size, floor count and ceiling heights
- ·Coating systems for each surface in the spec
- ·Submittals, samples and mockups
- ·Exterior scope, lifts and access
- ·Concrete, masonry and metal surfaces
- ·Number of colors and finishes
- ·Phasing and how many times we mobilize
Send the drawings, the spec and the bid date.
Weather
Commercial exteriors and Puget Sound weather
Large exterior faces take time, and the rainy season can stall them. Coatings need a dry surface, a surface temperature above the dew point and the label minimum, and dry time before rain. We plan exterior work in drier stretches, work face by face as weather allows and keep your super updated when the forecast changes the plan. Lifts and access are planned with your team, since other trades may need the same equipment and space.
Photos
The work we do
What GCs can expect
This is how your new construction painting subcontractor runs every job, from bid to closeout.
We bid from your documents
Send plans, a finish schedule or a written scope. We price what is drawn and spell out inclusions and exclusions, so bids are easy to compare.
We ask before we price
If a sheen, color or finish level is not called out, we ask during the bid, not after we start.
We work with your super
We plan our phases around drywall, cabinets, flooring and trim, and we keep in touch when the schedule shifts.
We prep before we paint
Masking, floor protection and surface prep come first on every phase.
We walk it with you
We do a walkthrough with your team, then work the punch list until it is closed.
We leave it clean
Our materials leave with us and the area is tidy for the next trade.
Where we offer development and commercial
We offer development and commercial for builders and general contractors across the Seattle area from our base in Everett, WA.
FAQ
Development and commercial painting FAQ
What types of commercial projects do you bid?+
Mixed use, office, medical, retail and light industrial buildings. Send the drawings and spec and we will price the paint scope.
Do you work from the project spec?+
Yes. We price and paint to the painting section of the spec and the finish schedule, and ask about anything that is unclear.
Can you prepare submittals?+
Yes. We put together product data and color samples for the architect's review when the spec calls for them.
Do you coat concrete and masonry?+
Yes, with coatings made for masonry, once the surface has cured as long as the coating maker requires.
Do you paint metal doors, frames and rails?+
Yes. Steel and galvanized metal get the primer and finish the spec lists, so the coating holds up.
How do you handle exterior work in the rainy season?+
We plan exterior faces for dry stretches, check temperature and dew point and keep your super updated when weather shifts the plan.
Do you work on mixed use buildings with units?+
Yes. The residential floors are covered on our multifamily page, and we can bid the full building.
Where do you work?+
We are based in Everett and work across the Seattle area, from Marysville to Renton.
Related Services
Other paint work we do for builders
Bidding a commercial project?
Send the drawings, spec and bid date.




