Tenant Improvement Painting
Tenant Improvement Painting in Seattle, WA
Downtown and South Lake Union TIs run on building rules and move-in dates. We plan paint around both.
At a Glance
We paint tenant improvements for Seattle GCs: office floors downtown and in South Lake Union, retail and restaurant spaces in the neighborhoods, and lab and medical suites from the spec. We follow the designer's finish schedule, work within the building's rules and close the punch list before move-in.
Seattle
Painting Seattle office, retail and restaurant build-outs
Downtown and South Lake Union towers have strict building rules. Freight elevators are booked, loading docks have time slots and noisy or high-odor work may be limited to certain hours. We plan our deliveries and spray work inside those rules. Our tenant improvement painting page covers our full TI process.
Neighborhood TIs in Capitol Hill, Ballard or Fremont are often ground floor retail or restaurant spaces in mixed use buildings. These bring storefront walls, back-of-house rooms with washable finishes and, often, exposed ceilings sprayed with a dryfall coating.
Older Seattle buildings bring their own prep work: patched plaster, old trim and many layers of paint. We price the prep that the walls need, not just the finish coats. See the Seattle service area page for the areas we cover.
Our Process
How we run the job in Seattle
Bid review
We read the TI set, the finish schedule and the paint spec, and list inclusions and exclusions.
Building rules
We review the landlord's rules for freight elevators, docks and work hours before we schedule.
Prep for older buildings
We check existing walls and trim and price the patching and priming they need.
Protect and prime
We cover floors, glass and finished millwork, then prime new drywall and put on finish coats in the colors and sheens on the schedule.
Touch-up and turnover
After flooring, millwork and fixtures, we touch up, walk the punch list and remove our materials so the space is ready for the tenant.
What Shapes the Bid
What shapes a Seattle TI bid
- ·Square footage and ceiling heights
- ·New walls versus existing walls and their condition
- ·Accent colors and specialty finishes
- ·Exposed ceilings
- ·Building rules for access and work hours
We do not publish prices. Send the plans and we will price the scope.
Schedule
What to send for a Seattle tenant improvement bid
Send the TI drawings, the designer's finish schedule, and any notes on accent colors, glass walls, or exposed ceilings. If the suite is in an occupied building, tell us the building's rules for work hours, elevator use and odor, and whether adjacent tenants will be in place. For a restaurant or retail opening, include the opening date so we can set primer, finish and punch around the other trades.
We read the set and list the surfaces, the prep, the primer and the number of finish coats in the bid. Exposed ceilings, when they are in the scope, are usually sprayed with a dryfall coating in the color the designer picks. If a product or sheen is not called out, we ask before we price it, so the number you get matches the job.
We do not publish prices. Include your bid due date and the project address or neighborhood, then send the package through the form below or call (425) 675-6989.
If the suite shares an elevator or a loading dock with other tenants, note that in the request so we can plan deliveries and masking around building use.
Photos
The work we do
What GCs can expect
This is how your new construction painting subcontractor runs every job, from bid to closeout.
We bid from your documents
Send plans, a finish schedule or a written scope. We price what is drawn and spell out inclusions and exclusions, so bids are easy to compare.
We ask before we price
If a sheen, color or finish level is not called out, we ask during the bid, not after we start.
We work with your super
We plan our phases around drywall, cabinets, flooring and trim, and we keep in touch when the schedule shifts.
We prep before we paint
Masking, floor protection and surface prep come first on every phase.
We walk it with you
We do a walkthrough with your team, then work the punch list until it is closed.
We leave it clean
Our materials leave with us and the area is tidy for the next trade.
FAQ
Tenant Improvement Painting in Seattle FAQ
Do you paint office TIs in downtown towers?+
Yes. We plan elevator time and work hours with your super and the building.
Do you paint restaurant and retail spaces?+
Yes, including back-of-house rooms that need washable finishes.
Do you paint lab spaces?+
Yes, to the coating systems in the spec.
Can you paint exposed ceilings?+
Yes. We usually spray them with a dryfall coating.
How do you handle old walls in historic buildings?+
We check them during the bid and price the patching and priming they need.
What do you need to bid?+
The TI set, finish schedule, paint spec and building rules.
Other Services
Other services in Seattle
Request a Bid
Bidding a Seattle tenant improvement?
Send the plans and bid date. We will price the paint scope.



