Multifamily Painting
Multifamily Painting in Lynnwood, WA
Lynnwood City Center is filling with large apartment buildings near light rail. We paint them unit by unit, floor by floor.
At a Glance
We paint apartment and mixed use buildings for Lynnwood GCs and developers, especially the larger projects near City Center, Alderwood and Highway 99. Units, corridors, amenity rooms, garages and exteriors are in our scope when the spec lists them. We bid from the plans and unit matrix.
Lynnwood
Painting Lynnwood's large apartment buildings
Since light rail reached Lynnwood in 2024, City Center has drawn large apartment buildings, some with several wings and structured parking. Jobs like these run for many months. Our multifamily painting page explains how we plan them.
Big buildings mean big repeat counts. We set the color schedule by unit type, wing and corridor, then follow drywall as each area is released. Units are walked and punched in groups so they can turn over in phases.
Highway 99 projects are usually smaller mid-rise buildings over retail or parking. Their exteriors face traffic grime and long wet seasons, so siding and railing coats get careful prep and dry weather. See the Lynnwood service area page for more.
Our Process
How we run the job in Lynnwood
Bid review
We take off units by type, plus corridors, stairs and common areas, and list what is in and out.
Phased turnover
We punch units in groups that match your turnover phases.
Wing by wing
Colors and access are planned for each wing and garage level.
Prep and protect
Each area is masked and covered before we spray, including windows, tubs and finished floors.
Prime and finish
We prime new drywall and put finish coats on as each area is released.
Schedule
How we schedule multifamily painting in Lynnwood
Large apartment buildings near City Center, Alderwood and Highway 99 are repeat work at scale: units by type, long corridors, stair towers and amenity floors. We set the color and sheen schedule by area before the first floor is finished, then follow drywall up the building and check later floors against that first floor. Units are walked with your team as they are released, so punch items are caught early instead of at the end of the job.
Podium levels and parking get coatings made for concrete, but only after the concrete has cured as long as the product requires. That work is on its own part of the calendar, not mixed in with drywall units.
Exterior faces follow the forecast, because Convergence Zone showers can move through Lynnwood even when nearby cities stay dry. We are about 14 miles away on I-5, which keeps site walks and punch visits close.
Send the plans, the finish schedule, the unit matrix and the floor release order if you have it, plus your bid due date. We do not publish prices. If ground floor retail shells are part of the same building, tell us whether they are in this paint scope or will be bid as a later tenant improvement. Send the plans, the finish schedule and the unit matrix through the form below or call (425) 675-6989. Include your bid due date.
What Shapes the Bid
What shapes a Lynnwood multifamily bid
- ·Unit count, unit types and wings
- ·Garage and podium scope
- ·Corridor and amenity areas
- ·Turnover phases
- ·Exterior siding and railings
We do not publish prices. Send the plans and we will price the scope.
Photos
The work we do
What GCs can expect
This is how your new construction painting subcontractor runs every job, from bid to closeout.
We bid from your documents
Send plans, a finish schedule or a written scope. We price what is drawn and spell out inclusions and exclusions, so bids are easy to compare.
We ask before we price
If a sheen, color or finish level is not called out, we ask during the bid, not after we start.
We work with your super
We plan our phases around drywall, cabinets, flooring and trim, and we keep in touch when the schedule shifts.
We prep before we paint
Masking, floor protection and surface prep come first on every phase.
We walk it with you
We do a walkthrough with your team, then work the punch list until it is closed.
We leave it clean
Our materials leave with us and the area is tidy for the next trade.
FAQ
Multifamily Painting in Lynnwood FAQ
Do you paint large apartment buildings near City Center?+
Yes. Large multifamily buildings are core work for us.
Can you punch units in phases?+
Yes. We walk and close units in groups to match your turnover plan.
Do you paint Highway 99 mixed use buildings?+
Yes, including units, retail shells and exteriors.
Do you paint parking garages?+
Yes, when the spec includes them.
How do you keep a big building consistent?+
One schedule by unit type and wing, checked against the first finished areas.
What do you need to bid?+
Plans, unit matrix, finish schedule and bid date.
Request a Bid
Bidding a Lynnwood apartment project?
Send the plans and bid date. We will price the paint scope.



