Multifamily Painting

Multifamily Painting in Bellevue, WA

From downtown residential towers to new mid-rise in BelRed, Bellevue apartments mean many floors and strict access plans.

Modern mid-rise apartment building with mixed panel and wood-look siding and balconies

At a Glance

We paint apartment and condo buildings for Bellevue GCs and developers, from downtown towers to mid-rise buildings in the BelRed and Wilburton areas. Units, corridors, amenity floors, lobbies and garages are in our scope when the spec lists them. We bid from the plans and unit matrix and plan floor releases with your super.

Bellevue

Painting Bellevue's residential towers and mid-rise apartments

Downtown Bellevue residential towers are concrete or steel buildings with many floors of units, high-end lobbies and amenity levels. Paint follows the drywall crew up the tower, with hoist and elevator time booked well ahead. Our multifamily painting page covers how we run these jobs.

In BelRed and Wilburton, new mid-rise apartments sit on land that used to hold warehouses, shops and auto lots near light rail. These are often wood frame over a concrete podium, with retail on the ground floor and a courtyard or roof deck for residents. Each area of the building gets its own color and sheen plan.

Higher-end finishes are common on the Eastside: more accent walls, darker trim colors and premium sheens in amenity spaces. We price what the finish schedule calls for and ask about anything it leaves open. The Bellevue service area page lists the neighborhoods we cover.

Our Process

How we run the job in Bellevue

1

Bid review

We take off units by type, plus corridors, stairs and common areas, and list what is in and out.

2

Tower logistics

We book hoist and elevator time per floor release and keep materials staged on the floor we are working.

3

Prep and protect

Each area is masked and covered before we spray, including windows, tubs and finished floors.

4

Prime and finish

We prime new drywall and put finish coats on as each floor is released.

5

Amenity finishes

Lobbies and amenity floors are painted last, after heavy trade traffic ends.

Schedule

How we schedule multifamily painting in Bellevue

Residential towers and mid-rise apartments in Downtown Bellevue, BelRed and Wilburton run floor by floor. Materials go up by hoist or freight elevator, and we book that time with your superintendent and the building's rules before each release. Work hours for loud or high-odor tasks are often set by the building, so spray windows and coat order are planned around those hours, not against them.

Colors and sheens are set by unit type, corridor and amenity floor at the start. As floors come out of drywall, we paint to that schedule and check later floors against the first finished floor. On a mid-rise with a concrete podium, podium and parking coatings wait until the concrete has cured as long as the product requires.

Send the plans, the finish schedule and the unit matrix, plus the floor release order if you have it. That is what we use to build the calendar into your bid. We do not publish prices. Include your bid due date and send the package through the form below or call (425) 675-6989.

What Shapes the Bid

What shapes a Bellevue multifamily bid

  • ·Floor count and unit mix
  • ·Tower versus podium construction
  • ·Amenity and lobby finish levels
  • ·Accent walls and dark colors
  • ·Hoist access and floor release order

We do not publish prices. Send the plans and we will price the scope.

Photos

The work we do

Modern mid-rise apartment building with mixed panel and wood-look siding and balconies
Four story apartment building under construction, wrapped in scaffolding with new windows installed
New construction kitchen with the island and cabinets masked for painting

What GCs can expect

This is how your new construction painting subcontractor runs every job, from bid to closeout.

We bid from your documents

Send plans, a finish schedule or a written scope. We price what is drawn and spell out inclusions and exclusions, so bids are easy to compare.

We ask before we price

If a sheen, color or finish level is not called out, we ask during the bid, not after we start.

We work with your super

We plan our phases around drywall, cabinets, flooring and trim, and we keep in touch when the schedule shifts.

We prep before we paint

Masking, floor protection and surface prep come first on every phase.

We walk it with you

We do a walkthrough with your team, then work the punch list until it is closed.

We leave it clean

Our materials leave with us and the area is tidy for the next trade.

FAQ

Multifamily Painting in Bellevue FAQ

Do you paint high-rise residential towers?+

Yes. We follow the drywall crew up and book vertical access with your super.

Do you paint apartments in BelRed and Wilburton?+

Yes. Podium and mid-rise buildings are core work for us.

Can you handle high-end lobby and amenity finishes?+

Yes. We paint them to the designer's finish schedule, near the end of the job.

Do dark colors change the bid?+

Yes. Deep colors and accent walls often need more coats, so we price them as listed.

Do you paint garages and podium levels?+

Yes, when in the spec, with coatings made for concrete.

What do you need to bid?+

The plans, unit matrix, finish schedule and bid date.

Request a Bid

Bidding a Bellevue apartment project?

Send the plans and bid date. We will price the paint scope.

See our Privacy Policy and Terms of Service.

Prefer to call? (425) 675-6989